Description:
Wood Wharf Block B3 is the first project we have worked on for Canary Wharf Contractors Limited which consists of the following:
Construction of a 14 floor core constructed with Peri RCS system, 10 story RC frame coming of existing ground floor slab and installation of 4no floors metal decking topped with concrete. The frame consists of a suspended swimming pool at level 3 formed with PUDLO concrete, a transfer slab at level 5 and coordination of cast-in channels for the follow on cladding contractor.
Package also include the installation of precast stairs along the supply of a tower crane.
A good working relationship has been key to getting works started on site along with the ongoing designs as we progress with our works.
Tower Cranes hire for the future frame package also included within the works.